Campbeltown Old Quay update – we have successfully completed the installation of the ground anchors through the newly installed AZ piled quay wall. The 45No. anchors were installation at a 45-degree angle by utilising a temporary cantilevered steel structure manufactured by Steel Mat Hire The temporary structure was designed to accommodate speedy relocation to new drill positions on site and utilising our steel mats as ballast. The anchors were successfully installed by Lloyds Datum Group over the past few months.