DAWSON-WAM delivers medium to large-scale steel sheet piling and combined steel tube and sheet pile solutions for a wide range of applications, including:
We own and operate the largest sheet piling rigs in the UK, making DAWSON-WAM the go-to piling contractor for major infrastructure projects. Our rigs are equipped with the latest ultra-high frequency vibro hammers, which significantly reduce the damaging low-frequency vibrations typically associated with lesser sheet piling systems, allowing safe working near sensitive structures.
As the largest Cased CFA piling specialist in the UK and Ireland, DAWSON-WAM integrates Cased CFA pre-augering into sheet piling works. This allows us to install sheet piles to significant depths in mudstones, siltstones, and sandstone, while:
Our next-generation quick docking system enables us to switch between pre-auger and vibro attachments in minutes instead of hours, maximising productivity and minimising downtime.
Discover more – visit our preboring link to get details on preaugering/predrilling/preboring.
In a UK industry first, DAWSON-WAM successfully reused sheet piles in a permanent structure for a National Highways project – a significant departure from standard practice where permanent works typically require new steel.
This innovative approach delivered:
This milestone demonstrates DAWSON-WAM’s commitment to sustainable engineering solutions and our ability to challenge conventional methods in pursuit of better environmental and economic outcomes.
We provide full design and installation of both temporary and permanent sheet pile support systems, including: